total-verfahren_opener_2600x1600_16x10

DIE ZEIT

Illustration for an article examining inefficiencies and management issues at Deutsche Bahn.

A train is depicted as a knot, subverting its usual association with speed, punctuality, and progress to visualize chaos and blocked processes.

Heading

Completely Messed Up
Delayed trains, high losses, disgruntled employees: For seven years, Richard Lutz has failed to improve the situation at Deutsche Bahn. Why is he still allowed to be its boss?

Disciplines

Editorial Illustration

Art Director

Jan Kny

Layout

Sina Giesecke

Photo Editor

Norman Hoppenheit

total-verfahren_detail_l_2000x1400_3x2
Lead illustration
total-verfahren_poster_v_1600x2000_4x5
DIE ZEIT Nº 37 / 2024

Explore more projects

Face of DeterrenceEditorial Illustration
Are We Ready?Editorial Illustration
Nuclear DeterrenceEditorial Illustration
Trump's HubrisEditorial Illustration
Facts? Who Cares!Editorial Illustration
The World DevourerEditorial Illustration
AfDEditorial Illustration
Rumblings of FreedomEditorial Illustration
Deportation FlightsEditorial Illustration
Ticking BombEditorial Illustration
How Special Are Humans?Editorial Illustration
Steps to FailureEditorial Illustration
BalanceEditorial Illustration
GreteGraphic Design, Typography, Poster Design
Stretching the TensionEditorial Illustration
Ping PongGraphic Design, Poster Design, Illustration
Two-front WarEditorial Illustration
AfghanistanIllustration, Poster Design
El Pont BlauEditorial Illustration
Outside the WindowGraphic Design
Domino EffectEditorial Illustration
chch-6C6C6C
Copyright © 2005 – 2026. 
All rights reserved.